The 5 engineering flow leak zones: FD-01 Focus Debt, HL-02 Handoff Lag, DB-03 Decision Bottleneck, RR-04 Requirement Readiness, MB-05 Meeting Bloat

Flow Sprint Template Pack

Sale price  $29.00 Regular price $49.00
Skip to product information
The 5 engineering flow leak zones: FD-01 Focus Debt, HL-02 Handoff Lag, DB-03 Decision Bottleneck, RR-04 Requirement Readiness, MB-05 Meeting Bloat

Flow Sprint Template Pack

Sale price  $29.00 Regular price $49.00

Everything you need to run the fix — not just find it.

The companion add-on to the Flow Audit Toolkit. Four working templates that turn your biggest leak into action, each tied to a leak zone.

  • Requirement-Readiness Checklist (RR-04) — a short Definition of Ready, an intake gate, and a per-story readiness log so work stops starting half-defined.
  • Standup Reset Guide (FD-01 / HL-02) — a 10-minute flow standup that walks the board right-to-left and surfaces every wait, instead of a status roll-call.
  • Flow Retrospective Board (Excel) — kept-flow / where-it-leaked / experiment / actions, built to run every sprint.
  • Decision Log (Excel, DB-03) — track blocking decisions with a 24–48h decide-or-delegate default.

Instant download. Editable Excel + PDFs. Built on the same CSPT framework as the Flow Audit Toolkit.

You may also like